Posted in | News | Water

PolyMet Mining Successfully Runs Pilot Water Treatment Plant

PolyMet Mining Corp. is pleased to announce that it has successfully treated over one million gallons of water through its Reverse Osmosis (RO) pilot water treatment plant.

The pilot plant has been operational since May 2012 and is designed to treat water containing elevated levels of sulfate. The purpose of the pilot plant is to demonstrate the ability to comply with Minnesota's strict water quality standards using a modular system that can be expanded to a full-scale treatment plant.

PolyMet owns 100% of the NorthMet Project, which comprises the development-stage NorthMet copper-nickel-precious metals ore-body and the nearby Erie Plant, located near Hoyt Lakes in the established mining district of the Mesabi Iron Range in northeastern Minnesota.

The NorthMet Project's potential impact on water quality is a key issue in the environmental review and permitting process. The successful pilot plant test is a significant accomplishment, demonstrating that water with elevated sulfate levels can be treated to meet Minnesota's 10 parts-per-million sulfate standard for waters used for the production of wild rice.

PolyMet partnered with GE Water & Process Technologies (GE) and Barr Engineering to design and operate the pilot plant using Reverse Osmosis (RO) membrane technology developed by GE. The test work demonstrates the technical and regulatory viability of Reverse Osmosis as a water treatment method that will enable PolyMet to successfully develop the NorthMet copper-nickel deposit and meet state and federal water quality standards.

"Our ability to successfully demonstrate the effectiveness of our planned water treatment systems prior to permitting and construction is extremely important," said Jon Cherry, President and CEO of PolyMet. "We want both the community and agencies to understand our commitment to constructing and operating NorthMet Project in an environmentally responsible manner that meets all applicable standards."

Yuvbir Singh, General Manager, Engineered Systems, GE Water and Process Technologies stated, "GE is pleased to be working with PolyMet and Barr to develop this site specific water treatment system. The combination of PolyMet and Barr's design and operating knowledge with GE's worldwide expertise in membrane treatment technology shows how application of the right technology can achieve compliance with very strict water quality standards."

PolyMet continues to operate the pilot treatment plant to refine operating parameters and increase efficiencies.

Source: http://www.polymetmining.com

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.