The city of Pittsburgh has honored solar researchers from Sandia National Laboratories for training city staff to install and maintain solar thermal and photovoltaic panels on city facilities.
Applied Materials, Inc. today announced at the SNEC 2010 PV Power Expo* that its Esatto Technology™ is expected to be used in more than 2 gigawatts of annual cell manufacturing capacity in the next few months at customer sites in China, Taiwan and Europe.
Solar Nation, Inc. has commissioned and installed a solar electric system having 187.95 kW capacity at a location of Rogers Machinery Company, Inc. in Portland, Oregon.
Solar modules manufacturer Solaria Corporation has commenced supplying its crystalline photovoltaic (PV) solar modules to customers located in Europe, Asia and North America. The novel modules provide project developers, system integrators and electric utilities with reliable and cost-effective PV modules meant for large-scale solar installations.
A solar PV system having 49.1 kW capacity has been engineered, designed and installed for the Novelty Crystal Corporation located in Queens, New York by Solar Energy Systems, LLC.
The Georgia Public Service Commission (PSC) has approved the modification of Georgia Power’s Green Energy program, providing more solar options for customers.
The length × width × depth measurement of the power panel used in the 46.6 Watt Solar Charger offered by Sunsei is 104.8 cm x 35.0 cm x 3.0 cm and weighs 4.3 kg. This model provides a rated current of 1.5 A and 15.5 V.
The height × width × depth measurement of the Xantrex GT500E Grid Tie Inverter is 211.2 cm x 240.6 cm x 60.5 cm and weighs 1770 kg.
The 20kW Wind Turbine offered by Take Action Solar & Wind can be utilized for both grid connected and off grid applications. The rated output of this model is 20 kW and its maximum output is 30 kW.
AZUR Solar has completed a 31kilowatt solar electric system for the Orlando Science Center utilizing four SMA Sunny Boy 7000US solar inverters to convert the direct current (DC) electricity collected by the panels into grid-compatible alternating current (AC) electricity for use in the building.
Terms
While we only use edited and approved content for Azthena
answers, it may on occasions provide incorrect responses.
Please confirm any data provided with the related suppliers or
authors. We do not provide medical advice, if you search for
medical information you must always consult a medical
professional before acting on any information provided.
Your questions, but not your email details will be shared with
OpenAI and retained for 30 days in accordance with their
privacy principles.
Please do not ask questions that use sensitive or confidential
information.
Read the full Terms & Conditions.