Posted in | News | Recycling | Energy

Valio’s New Heat Pump System in Seinäjoki Factory Promotes Energy Recycling

A new modern heat pump system was commissioned at the Seinäjoki production plant at the beginning of 2024, with the aim of achieving annual savings of around 12-14 percent in heating at the plant. In about six months of operation, the new system has produced about 5800 MWh of heat. This is enough to heat the water for a five-minute shower for 2.8 million people in Finland.

Image Credit: Valio

The new heat pump system replaces the old system that had reached the end of its useful life. The aim of the renewal was to improve the energy efficiency of the production plant and save on energy costs. The system has a maximum thermal output of 2.8 MW and a heat recovery capacity of about 2.2 MW. The amount of the investment is several million euros, and the project has been granted Business Finland's energy support.

“The new heat pump system recovers heat from the cooling system of the milk evaporation process and from the condensing circuit of the factory’s refrigeration plant, reducing their electricity and water consumption. Four new heat pumps can reuse otherwise wasted energy flows. The heat pumps produce 80-degree water for the heating network, which is then distributed to more than 20 heating points or heat accumulators in the factory. This is energy recycling at its best,” says Valio’s Energy Specialist Jussi Jääskeläinen.

The new heat pumps use ammonia as a refrigerant, which is also used in the Seinäjoki factory’s refrigeration plant. Ammonia has a GWP (Global Warming Potential) value of zero. It is therefore an environmentally friendly and natural refrigerant with good prospects for future use.

“The project is a good example of how electrification can improve energy efficiency,” Jääskeläinen adds.

The Seinäjoki factory produces, e.g., all Valio butters, Valio Oivariini® and Kevytlevi® spreads, quark, cottage cheese, Valio Profeel® quarks and puddings, and Valio MiFU milk-based alternatives to meat. In terms of products, the factory is one of Valio’s more diverse, and in terms of milk processing volume, it is one of the largest. The Valio producer laboratory operates in conjunction with the factory.

Source: https://www.valio.com/

Citations

Please use one of the following formats to cite this article in your essay, paper or report:

  • APA

    Valio Ltd. (2024, May 30). Valio’s New Heat Pump System in Seinäjoki Factory Promotes Energy Recycling. AZoCleantech. Retrieved on December 05, 2024 from https://www.azocleantech.com/news.aspx?newsID=34917.

  • MLA

    Valio Ltd. "Valio’s New Heat Pump System in Seinäjoki Factory Promotes Energy Recycling". AZoCleantech. 05 December 2024. <https://www.azocleantech.com/news.aspx?newsID=34917>.

  • Chicago

    Valio Ltd. "Valio’s New Heat Pump System in Seinäjoki Factory Promotes Energy Recycling". AZoCleantech. https://www.azocleantech.com/news.aspx?newsID=34917. (accessed December 05, 2024).

  • Harvard

    Valio Ltd. 2024. Valio’s New Heat Pump System in Seinäjoki Factory Promotes Energy Recycling. AZoCleantech, viewed 05 December 2024, https://www.azocleantech.com/news.aspx?newsID=34917.

Tell Us What You Think

Do you have a review, update or anything you would like to add to this news story?

Leave your feedback
Your comment type
Submit

While we only use edited and approved content for Azthena answers, it may on occasions provide incorrect responses. Please confirm any data provided with the related suppliers or authors. We do not provide medical advice, if you search for medical information you must always consult a medical professional before acting on any information provided.

Your questions, but not your email details will be shared with OpenAI and retained for 30 days in accordance with their privacy principles.

Please do not ask questions that use sensitive or confidential information.

Read the full Terms & Conditions.